EUR-Lex Access to European Union law

Back to EUR-Lex homepage

This document is an excerpt from the EUR-Lex website

Document 52024XC03107

Commission notice concerning the application of the Regional Convention on pan-Euro-Mediterranean preferential rules of origin or the protocols on rules of origin providing for diagonal cumulation between the Contracting Parties to this Convention

PUB/2024/368

OJ C, C/2024/3107, 3.5.2024, ELI: http://data.europa.eu/eli/C/2024/3107/oj (BG, ES, CS, DA, DE, ET, EL, EN, FR, GA, HR, IT, LV, LT, HU, MT, NL, PL, PT, RO, SK, SL, FI, SV)

ELI: http://data.europa.eu/eli/C/2024/3107/oj

European flag

Official Journal
of the European Union

EN

C series


C/2024/3107

3.5.2024

Commission notice concerning the application of the Regional Convention on pan-Euro-Mediterranean preferential rules of origin or the protocols on rules of origin providing for diagonal cumulation between the Contracting Parties to this Convention

(C/2024/3107)

For the purpose of the application of diagonal cumulation of origin among the Contracting Parties to the Regional Convention on pan-Euro-Mediterranean preferential rules of origin (1) (hereafter referred to as ‘the Convention’), the Parties concerned notify each other, through the European Commission, of the origin rules in force with the other Parties.

It is recalled that diagonal cumulation can only be applied if the Parties of final manufacture and of final destination have concluded free trade agreements, containing identical rules of origin, with all the Parties participating in the acquisition of originating status, i.e. with all the Parties from which the materials used originate. Materials originating in a Party which has not concluded an agreement with the Parties of final manufacture and/or of final destination shall be treated as non-originating. Specific examples are given in the Explanatory Notes concerning the pan-Euro-Mediterranean protocols on rules of origin (2).

Based on the notifications made by the Parties to the European Commission, the tables attached specify:

 

Table 1 – a simplified overview of cumulation possibilities.

 

Tables 2 and 3 – the date from which diagonal cumulation becomes applicable.

In Table 1, an ‘X’ marks the existence between 2 partners of a free trade agreement containing rules of origin allowing cumulation based on pan-Euro-Mediterranean model rules of origin. To use diagonal cumulation with a third partner, an ‘X’ should be present in all the intersection of the table between the 3 partners. However, there are some exceptions to diagonal cumulation. For such cases, either (1), (2) or an (*) next to the ‘X’ will point out the exceptions to consider.

In Table 2, the dates mentioned refer to:

The date of application of diagonal cumulation on the basis of Article 3 of Appendix I to the Convention where the free trade agreement concerned refers to the Convention. In that case the date is preceded by ‘(C)’;

The date of application of the protocols on rules of origin providing for diagonal cumulation attached to the free trade agreement concerned, in other cases;

The date of application of diagonal cumulation on the basis of Article 7 of Appendix I to the Convention as amended by Decision No 1/2023 of the Joint Committee of the Convention of 7 December 2023  (3). In that case the date is preceded by ‘(R)’

In Table 3 the dates mentioned refer to the date of application of the protocols on rules of origin providing for diagonal cumulation attached to the free trade agreements between the EU, Türkiye and the participants to the EU's Stabilisation and Association Process. Each time a reference to the Convention is made in a free trade agreement between Parties in this table, a date preceded by ‘(C)’ and/or ‘(R)’, as the case may be, has been added in Table 2.

It is also recalled that materials originating in Türkiye covered by the EU- Türkiye customs union can be incorporated as originating materials for the purpose of diagonal cumulation between the European Union and the countries participating in the Stabilisation and Association Process with which an origin protocol is in force.

The codes for the Contracting Parties listed in the tables are given here below.

European Union

EU

EFTA States:

Iceland

IS

Switzerland (including Liechtenstein) (4)

CH (+ LI)

Norway

NO

The Faroe Islands

FO

The participants in the Barcelona Process:

Algeria

DZ

Egypt

EG

Israel

IL

Jordan

JO

Lebanon

LB

Morocco

MA

Palestine (*1)

PS

Syria

SY

Tunisia

TN

Türkiye

TR

The participants in the EU’s Stabilisation and Association Process:

Albania

AL

Bosnia and Herzegovina

BA

North Macedonia

MK

Montenegro

ME

Serbia

RS

Kosovo (*2)

KO

The Republic of Moldova

MD

Georgia

GE

Ukraine

UA

This notice replaces the notice published in OJ C/2024/1623 of 22.02.2024 ).

Table 1

Simplified overview of diagonal cumulation possibilities in the pan-Euro-Med zone

 

 

EFTA states

 

Participants in the Barcelona Process

 

Participants in the EU’s Stabilisation and Association Process

 

 

 

 

EU

CH (+LI)

IS

NO

FO

DZ

EG

IL

JO

LB

MA

PS

SY

TN

TR

AL

BA

KO

ME

MK

RS

MD

GE

UA

EU

 

X

X

X

X

X

X

X

X

 

X

X

 

X

X (5)

X

X

X

X

X

X

X

X

X

CH (+LI)

X

 

X

X

X

 

X

X

X

X

X

X

 

X

X

X

X

 

X

X

X

 

X

X

IS

X

X

 

X

X

 

X

X

X

X

X

X

 

X

X

X

X

 

X

X

X

 

X

X

NO

X

X

X

 

X

 

X

X

X

X

X

X

 

X

X

X

X

 

X

X

X

 

X

X

FO

X

X

X

X

 

 

 

 

 

 

 

 

 

 

X

 

 

 

 

 

 

 

 

 

DZ

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EG

X

X

X

X

 

 

 

 

X

 

X

 

 

X

X

 

 

 

 

 

 

 

 

 

IL

X

X

X

X

 

 

 

 

X

 

 

 

 

 

X

 

 

 

 

 

 

 

 

 

JO

X

X

X

X

 

 

X

X

 

 

X

 

 

X

 

 

 

 

 

 

 

 

 

 

LB

 

X

X

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MA

X

X

X

X

 

 

X

 

X

 

 

 

 

X

X

 

 

 

 

 

 

 

 

 

PS

X

X

X

X

 

 

 

 

 

 

 

 

 

 

X

 

 

 

 

 

 

 

 

 

SY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X

 

 

 

 

 

 

 

 

 

TN

X

X

X

X

 

 

X

 

X

 

X

 

 

 

X

 

 

 

 

 

 

 

 

 

TR

X (5)

X

X

X

X

 

X

X

 

 

X

X

X

X

 

X (*3)

X (*3)

 (*3)

X (*3)

X (*3)

X (*3)

X

X (6)

 

AL

X

X

X

X

 

 

 

 

 

 

 

 

 

 

X (*3)

 

X

X

X

X

X

X

 

 

BA

X

X

X

X

 

 

 

 

 

 

 

 

 

 

X (*3)

X

 

X

X

X

X

X

 

 

KO

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 (*3)

X

X

 

X

X

X

X

 

 

ME

X

X

X

X

 

 

 

 

 

 

 

 

 

 

X (*3)

X

X

X

 

X

X

X

 

 

MK

X

X

X

X

 

 

 

 

 

 

 

 

 

 

X (*3)

X

X

X

X

 

X

X

 

X

RS

X

X

X

X

 

 

 

 

 

 

 

 

 

 

X (*3)

X

X

X

X

X

 

X

 

 

MD

X

 

 

 

 

 

 

 

 

 

 

 

 

 

X

X

X

X

X

X

X

 

 

X

GE

X

X

X

X

 

 

 

 

 

 

 

 

 

 

X (6)

 

 

 

 

 

 

 

 

X

UA

X

X

X

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X

 

X

X

 

Table 2

Date of application of rules of origin providing for diagonal cumulation in the pan-Euro-Med zone

 

 

EFTA states

 

Participants in the Barcelona Process

 

Participants in the EU's Stabilisation and Association Process

 

 

 

 

EU

CH(+LI)

IS

NO

FO

DZ

EG

IL

JO

LB

MA

PS

SY

TN

TR

AL

BA

KO

ME

MK

RS

MD

GE

UA

EU

 

1.1.2006

(C)1.2.2016

(R) 1.1.2025

1.1.2006

(C) 1.5.2015

(R) 1.1.2025

1.1.2006

(C) 1.5.2015

(R) 1.1.2025

1.12.2005

(C) 12.5.2015

(R) 1.1.2025

1.11.2007

1.3.2006

(C) 1.2.2016

1.1.2006

1.7.2006

(C) 01.09.2021

(R) 1.1.2025

 

1.12.2005

1.7.2009

(C) 1.3.2016

(R) 1.1.2025

 

1.8.2006

 (7)

(C) 1.5.2015

(R) 1.1.2025

(C) 9.12.2016

(R) 1.1.2025

(C) 1.4.2016

(R) 1.1.2025

(C) 1.2.2015

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

(C) 1.2.2015

(R) 1.1.2025

(C) 1.12.2016

(R) 1.1.2025

(C) 1.6.2018

(R) 1.1.2025

(C) 1.1.2019

(R) 1.1.2025

CH

(+LI)

1.1.2006

(C) 1.2. 2016

(R) 1.1.2025

 

1.8.2005

(C) 1.7.2013

(R) 1.1.2025

1.8.2005

(C) 1.7.2013

(R) 1.1.2025

1.1.2006

 

1.8.2007

1.7.2005

17.7.2007

1.1.2007

1.3.2005

1.5.2016

 

1.6.2005

1.9.2007

(C) 1.12.2019

(C) 1.5.2015

(R) 1.1.2025

(C) 1.1.2015

(R) 1.1.2025

 

(C) 1.9.2012

(R) 1.1.2025

1.2.2016

(C) 1.4.2022

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

 

(C) 1.5.2018

(R) 1.1.2025

1.6.2012

IS

1.1.2006

(C) 1.5.2015

(R) 1.1.2025

1.8.2005

(C) 1.7.2013

(R) 1.1.2025

 

1.8.2005

(C) 1.7.2013

(R) 1.1.2025

1.11.2005

 

1.8.2007

1.7.2005

17.7.2007

1.1.2007

1.3.2005

1.5.2016

 

1.3.2006

1.9.2007

(C) 1.12.2019

(C) 1.5.2015

(R) 1.1.2025

(C) 1.1.2015

(R) 1.1.2025

 

(C) 1.10.2012

(R) 1.1.2025

1.5.2015

(C) 1.4.2022

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

 

(C) 1.9.2017

(R) 1.1.2025

1.6.2012

NO

1.1.2006

(C) 1.5.2015

(R) 1.1.2025

1.8.2005

(C) 1.7.2013

(R) 1.1.2025

1.8.2005

(C) 1.7.2013

(R) 1.1.2025

 

1.12.2005

 

1.8.2007

1.7.2005

17.7.2007

1.1.2007

1.3.2005

1.5.2016

 

1.8.2005

1.9.2007

(C) 1.12.2019

(C) 1.5.2015

(R) 1.1.2025

(C) 1.1.2015

(R) 1.1.2025

 

(C) 1.11.2012

(R) 1.1.2025

1.5.2015

(C) 1.4.2022

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

 

(C) 1.9.2017

(R) 1.1.2025

1.6.2012

FO

1.12.2005

(C) 12.5.2015

1.1.2006

1.11.2005

1.12.2005

 

 

 

 

 

 

 

 

 

 

(C) 1.10.2017

 

 

 

 

 

 

 

 

 

DZ

1.11.2007

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EG

1.3.2006

(C) 1.2.2016

1.8.2007

1.8.2007

1.8.2007

 

 

 

 

6.7.2006

 

6.7.2006

 

 

6.7.2006

1.3.2007

 

 

 

 

 

 

 

 

 

IL

1.1.2006

1.7.2005

1.7.2005

1.7.2005

 

 

 

 

9.2.2006

 

 

 

 

 

1.3.2006

 

 

 

 

 

 

 

 

 

JO

1.7.2006

(C) 01.09.2021

(R) 1.1.2025

17.7.2007

17.7.2007

17.7.2007

 

 

6.7.2006

9.2.2006

 

 

6.7.2006

 

 

6.7.2006

 

 

 

 

 

 

 

 

 

 

LB

 

1.1.2007

1.1.2007

1.1.2007

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MA

1.12.2005

1.3.2005

1.3.2005

1.3.2005

 

 

6.7.2006

 

6.7.2006

 

 

 

 

6.7.2006

1.1.2006

 

 

 

 

 

 

 

 

 

PS

1.7.2009

(C) 1.3.2016

(R) 1.1.2025

1.5.2016

1.5.2016

1.5.2016

 

 

 

 

 

 

 

 

 

 

(C)) 26.03.2021

 

 

 

 

 

 

 

 

 

SY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.1.2007

 

 

 

 

 

 

 

 

 

TN

1.8.2006

1.6.2005

1.3.2006

1.8.2005

 

 

6.7.2006

 

6.7.2006

 

6.7.2006

 

 

 

1.7.2005

 

 

 

 

 

 

 

 

 

TR

 (7)

1.9.2007

(C) 1.12.2019

1.9.2007

(C) 1.12.2019

1.9.2007

(C) 1.12.2019

(C) 1.10.2017

 

1.3.2007

1.3.2006

 

 

1.1.2006

(C)) 26.03.2021

1.1.2007

1.7.2005

 

(C) 3.05.2021

(C) 1.08.2021

1.9.2019

(C) 1.06.2021

( C) 1.8.2018

(C) 1.6.2019

(C) 1.10.2017

(C) 29.04.2021

 

AL

(C) 1.5.2015

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

 

 

 

 

 

 

 

 

 

 

(C) 3.05.2021

 

(C) 1.2.2015

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

 

BA

(C) 9.12.2016

(R) 1.1.2025

(C) 1.1.2015

(R) 1.1.2025

(C) 1.1.2015

(R) 1.1.2025

(C) 1.1.2015

(R) 1.1.2025

 

 

 

 

 

 

 

 

 

 

(C) 1.08.2021

(C) 1.2.2015

(R) 1.1.2025

 

(C) 1.4.2014

(R) 1.1.2025

(C) 1.2.2015

(R) 1.1.2025

(C) 1.2.2015

(R) 1.1.2025

(C) 1.2.2015

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

 

KO

(C) 1.4.2016

(R) 1.1.2025

 

 

 

 

 

 

 

 

 

 

 

 

 

1.9.2019

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

 

ME

(C) 1.2.2015

(R) 1.1.2025

(C) 1.9.2012

(R) 1.1.2025

(C) 1.10.2012

(R) 1.1.2025

(C) 1.11.2012

(R) 1.1.2025

 

 

 

 

 

 

 

 

 

 

(C) 1.06.2021

(C) 1.4.2014

(R) 1.1.2025

(C) 1.2.2015

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

 

MK

(C) 1.5.2015

(R) 1.1.2025

1.2.2016

(C) 1.4.2022

(R) 1.1.2025

1.5.2015

(C) 1.4.2022

(R) 1.1.2025

1.5.2015

(C) 1.4.2022

(R) 1.1.2025

 

 

 

 

 

 

 

 

 

 

(C) 1.8.2018

(C) 1.4.2014

(R) 1.1.2025

(C) 1.2.2015

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

(C) 06.07.2023

(R) 1.1.2025

RS

(C) 1.2.2015

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

(C) 1.5.2015

(R) 1.1.2025

 

 

 

 

 

 

 

 

 

 

(C) 1.6.2019

(C) 1.4.2014

(R) 1.1.2025

(C) 1.2.2015

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

(C) 1.4.2014

(R) 1.1.2025

 

 

MD

(C) 1.12.2016

(R) 1.1.2025

 

 

 

 

 

 

 

 

 

 

 

 

 

(C) 1.10.2017

(C)1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

(C) 1.4.2014

(R) 1.1.2025

 

 

(C) 24.5.2023

(R) 1.1.2025

GE

(C) 1.6.2018

(R) 1.1.2025

(C) 1.5.2018

(R) 1.1.2025

(C) 1.9.2017

(R) 1.1.2025

(C) 1.9.2017

(R) 1.1.2025

 

 

 

 

 

 

 

 

 

 

(C) 29.04.2021

 

 

 

 

 

 

 

 

(C) 26.3.2020

UA

(C) 1.1.2019

(R) 1.1.2025

1.6.2012

1.6.2012

1.6.2012

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(C) 6.7.2023

(R) 1.1.2025

 

(C) 24.5.2023

(R) 1.1.2025

(C) 26.3.2020

 

Table 3

Date of application of the protocols on rules of origin providing for diagonal cumulation between the European Union, Albania, Bosnia and Herzegovina, Kosovo, North Macedonia, Montenegro, Serbia and Türkiye

 

EU

AL

BA

KO

MK

ME

RS

TR

EU

 

1.1.2007

1.7.2008

1.4.2016

1.1.2007

1.1.2008

8.12.2009

 (8)

AL

1.1.2007

 

22.11.2007

1.4.2014

26.7.2007

26.7.2007

24.10.2007

1.8.2011

BA

1.7.2008

22.11.2007

 

1.4.2014

22.11.2007

22.11.2007

22.11.2007

14.12.2011

KO

1.4.2016

1.4.2014

1.4.2014

 

1.4.2014

1.4.2014

1.4.2014

1.9.2019

MK

1.1.2007

26.7.2007

22.11.2007

1.4.2014

 

26.7.2007

24.10.2007

1.7.2009

ME

1.1.2008

26.7.2007

22.11.2007

1.4.2014

26.7.2007

 

24.10.2007

1.3.2010

RS

8.12.2009

24.10.2007

22.11.2007

1.4.2014

24.10.2007

24.10.2007

 

1.9.2010

TR

 (8)

1.8.2011

14.12.2011

1.9.2019

1.7.2009

1.3.2010

1.9.2010

 


(1)   OJ L 54, 26.2.2013, p. 4.

(2)   OJ C 83, 17.4.2007, p. 1.

(3)   OJ L, 2024/390, 19.2.2024, ELI: http://data.europa.eu/eli/dec/2024/390/oj

(4)  Switzerland and the Principality of Liechtenstein form a customs union.

(*1)  This designation shall not be construed as recognition of a State of Palestine and is without prejudice to the individual positions of the Member States on this issue

(*2)  This designation is without prejudice to positions on status and is in line with UNSCR 1244 and the ICJ Opinion on the Kosovo Declaration of Independence.

(*3)  Diagonal cumulation between Türkiye, Albania, Bosnia and Herzegovina, Kosovo, North Macedonia, Montenegro and Serbia is possible. However, plese see Table 3 for the possibility of diagonal cumulation between the European Union, Türkiye, Albania, Bosnia and Herzegovina, Kosovo, North Macedonia, Montenegro and Serbia.

(5)  For goods covered by the EU- Türkiye customs union, the date of application is 27 July 2006.

For agricultural products, the date of application is 1 January 2007(cumulation is not applicable with MD and GE).

For coal and steel products, the date of application is 1 March 2009(cumulation is not applicable with MD and GE)

(6)  For the products:

under Chapters 1 to 24 of the Harmonised Commodity Description and Coding System; and

covered by the Annex 1 to the FTA between the Republic of Türkiye and Georgia cumulation of origin can be applied only when originating in the Republic of Türkiye and Georgia

(7)  For goods covered by the EU- Türkiye customs union, the date of application is 27 July 2006.

For agricultural products, the date of application is 1 January 2007.

For coal and steel products, the date of application is 1 March 2009.

(8)  For goods covered by the EU- Türkiye customs union, the date of application is 27 July 2006. Not applicable for agricultural products and for coal and steel products.


ANNEX

Notifications concerning electronic issuance of movement certificates EUR.1 and EUR-MEDaccording to paragraph 1(d) of the Recommendation no 1/2023 of the Joint Committee of the Convention (1)

Norway

System: Altinn - the government portal for digital dialogue between businesses, private individuals and public agencies

Starting date: 02.04.2020

Link to verify authenticity the movement certificates: https://eur1.toll.no

Türkiye

System: MEDOS - ‘The Automation System for Certificates of Origin and Movement Certificates’

Starting date: 24 April 2018

Unique link for every movement certificate starts with ‘ https://mdc.gtb.gov.tr or ’ https://uygulama.gtb.gov.tr (accessed by scanning the QR code on the certificate or by typing the path printed on the certificate)

Morocco

Starting date: 12 January 2021

Link to verify authenticity the movement certificates: http://www2.douane.gov.ma/certificate/

Israel

System: Global Gate

Starting date: 1 April 2024

Link to verify authenticity the movement certificates:

https://shaarolami-query.customs.mof.gov.il/CustomsPilotWeb/CertificateOfOrigin


(1)   OJ L, 2024/243, 15.1.2024, ELI: http://data.europa.eu/eli/reco/2024/243/oj


ELI: http://data.europa.eu/eli/C/2024/3107/oj

ISSN 1977-091X (electronic edition)


Top